name | image | type | date Commissioned | date expected | date Start construction | Diameter (m) | start locality | start administrative division | start locality country | start locality division | end locality | end administrative division | end locality country | end locality division | Length (m) | Maximum discharge (m³/day) |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
GALSI | Gas | 2014 | 'Arab al-Jahalin | Laghouat | Algeria | Africa | 832,000 | 27,390,000 | ||||||||
Maghreb–Europe Gas Pipeline | Gas | 1996 | 'Arab al-Jahalin | Laghouat | Algeria | Africa | 32,868,000 | |||||||||
Medgaz | Gas | 2010 | 2009 | 'Arab al-Jahalin | Laghouat | Algeria | Africa | 'Arab al-Jahalin | Andalusia | Spain | Europe | 757,000 | 21,912,000 | |||
Trans-Mediterranean Pipeline | Gas | 1983 | 'Arab al-Jahalin | Laghouat | Algeria | Africa | Emilia-Romagna | Italy | Europe | 82,718,000 |